Attenuation Tank

Attenuation Tanks

At Wallace Groundworks, we specialise in the installation of high-performance attenuation tanks, delivering reliable, compliant drainage solutions for commercial and residential developments.

 

With decades of combined experience, we ensure every installation is completed safely, efficiently, and to the highest standard.

What is an Attenuation Tank?

An attenuation tank is an underground structure designed to store and control surface water runoff, reducing the risk of flooding and ensuring compliance with drainage regulations.

We install systems such as the StormTank™ modular panel system, a versatile and robust solution widely used across the construction industry.​

​

​

Concrete attenuation tank installation on construction site

System Capabilities

StormTank systems are highly adaptable and can be designed to suit a wide range of applications, including:

​

  • Attenuation tanks 

  • Storage tanks 

  • CSO chambers 

  • Pumping stations 

  • Valve chambers 

  • Large manholes ​​

​

​

Crane positioning a precast concrete culvert section

1. Site Preparation & Level Check

​We begin with accurate setting out and level verification to ensure the tank is installed to exact specifications.

​

​

Excavation site for attenuation tank installation

2. Blinding Concrete

A blinding layer is installed to the required gradient, forming a stable base for construction.

Excavated site prepared for attenuation tanks installation.

3. External Wall Installation

Precast external wall panels are installed and aligned.

Concrete attenuation tank under construction on site

4. Structural Reinforcement

We install bespoke reinforcement to tie the base into the walls, incorporating drainage solutions where required.

Construction site showing attenuation tank installation

5. Base Pour (In-Situ Concrete)

The base is poured, vibrated, and finished to achieve maximum strength and durability.

Workers pouring concrete for an attenuation tank base

6. Internal Wall Installation

Precast internal walls are carefully positioned, bedded, and aligned.

Concrete attenuation tanks under construction

7. Roof Installation

Precast roof sections are installed securely.

Construction site showing attenuation tank installation.

8. Structural Steel & Final Pour

Structural steel is fitted, followed by a final in-situ concrete pour to fully seal the structure.

Construction worker pouring concrete for attenuation tanks

Why Choose Wallace Groundworks?

  • Experienced, qualified installation team 

  • Proven track record in drainage and infrastructure 

  • Fully compliant with industry standards 

  • Reliable delivery with a focus on safety and quality 

​

We understand that getting it right first time matters — especially when it comes to below-ground infrastructure.

 

Wallace Groundworks team wearing high visibility clothing on a construction site

Get in Touch

If you’re planning a project that requires attenuation or drainage solutions, we’re here to help.

​

📞 Contact Wallace Groundworks today to discuss

your requirements.

​

​

​